Discover Online Profitable Buyers, Suppliers, Markets, Products and Monitor Competition From Over 100+ Countries In Single Subscription
ENTER ENGINEERING PRIVATE LIMITED PU TES is a foremost import company in Uzbekistan. We provide a supply chain intelligence report of ENTER ENGINEERING PRIVATE LIMITED PU TES that covers company profile, top imports, foreign suppliers, ports used, etc. The Import data of ENTER ENGINEERING PRIVATE LIMITED PU TES is driven from Uzbekistan import marine time database, government authorities, and other sources of the Uzbekistan. We update data regularly and provide latest and updated Import Data.
We provide an online customized Uzbekistan Importers Data dashboard where traders can analyse competitors, Uzbekistan importers, overseas suppliers and exporters, top imported products, importing partners etc. ENTER ENGINEERING PRIVATE LIMITED PU TES can analyse trade relations and sourcing for buyers by time like monthly, yearly.
ENTER ENGINEERING PRIVATE LIMITED PU TES has customized dashboard for Uzbekistan importers. Also they provide demo data search and you can search and analyse all available data records in this. You can download Import data set by selecting them.
Import Shipments3
Buyers3
Export Shipments0
Suppliers0
ENTER ENGINEERING PRIVATE LIMITED PU TES automation import markets
Based on Uzbekistan Countries shipment data.
Top import Competitors
By Shipments
Top import Supplier
By Shipments
Top import HsCode
By Shipments
Top import Country
By Shipments
Top import Ports
By Shipments
If you are looking to establish relationship with ENTER ENGINEERING PRIVATE LIMITED PU TES Automation you can save time by getting access to the key decision makers and get a detailed report.
3 Import Shipments found from 3 importing countries.
HSN Code | Product Description | Imports | Exporter | Origin | Destination | Qty. | More Columns Click to View |
---|---|---|---|---|---|---|---|
8502392000 | 1. POWER PLANT (COMBINED-CYCLE GAS PLANT WITH A CAPACITY OF 440 MW PGU-440), DISASSEMBLED, WITH AUXILIARY EQUIPMENT, CONSISTS OF: WELDED PLATE 22-23-24, 15 PCS. - 1 PC STAKE, WEIGHT: 979 KG 2. PLACES 1, 1 PLACE 8. 101 9. 003 10. 2013/ WITH A CAPACITY OF 440 MW PSU-440 11. 02 1. WELDED PLATE 32-33, STAKE 27 PCS. 2. H/M 1. WELDED PLATE 26-27, 6 PCS. 2. H/M 1. MOVABLE PLATE, STAKE 1 PC. - WEIGHT: 984 KG 2. PLACES 1, 1 PLACE 1. MOVABLE PLATE, STAKE 1 PC. - WEIGHT: 776 KG 2. PLACES 1, 1 | NULL | Uzbekistan | 0 | 60 More Columns Available | ||
8502392000 | 1. POWER PLANT (COMBINED-CYCLE GAS PLANT WITH A CAPACITY OF 440 MW PGU-440), DISASSEMBLED, WITH AUXILIARY EQUIPMENT, CONSISTS OF: PLATFORM, 2 PCS. - 1 PC STAKE, WEIGHT: 2071 KG 2. PLACES 1, 1 PLACE 8. 101 9. 003 10. 2013/ WITH A CAPACITY OF 440 MW PSU-440 11. 02 1. PLATFORM, STAKE 1 PC. 2. H/M 1. THE PANEL OF THE BOILER BODY IS RECYCLED METAL THICKNESS. 25, COUNT 1 PC. - WEIGHT: 1590 KG 2. PLACES 1, 1 PLACE 1. THE PANEL OF THE BOILER BODY IS RECYCLED METAL THICKNESS, 12 PCS. 2. H/M 1. THE PANEL | NULL | Uzbekistan | 0 | |||
8502392000 | 1. POWER PLANT (COMBINED-CYCLE GAS PLANT WITH A CAPACITY OF 440 MW PGU-440), DISASSEMBLED, WITH AUXILIARY EQUIPMENT, CONSISTS OF: SEGMENTS OF THE FRAME OF THE CHIMNEY (16268 KG.) - 1 PC., WEIGHT: 19188 KG 2. PLACES 1, 1 PLACE 8. 101 9. 003 10. 2013/ WITH A CAPACITY OF 440 MW PSU-440 11. 02 1. SEGMENTS OF THE CHIMNEY FRAME(2920KG.) 2. H/M TOTAL NUMBER OF SEATS: 1 | NULL | Uzbekistan | 0 | |||
See all that you can accomplish with Eximpedia