Discover Online Profitable Buyers, Suppliers, Markets, Products and Monitor Competition From Over 100+ Countries In Single Subscription
DIRE?TSIYA ?APITAL NOGO STROITEL STVA AO O ZBEKISTON TEMIR YO LLARI is a foremost import company in Uzbekistan. We provide a supply chain intelligence report of DIRE?TSIYA ?APITAL NOGO STROITEL STVA AO O ZBEKISTON TEMIR YO LLARI that covers company profile, top imports, foreign suppliers, ports used, etc. The Import data of DIRE?TSIYA ?APITAL NOGO STROITEL STVA AO O ZBEKISTON TEMIR YO LLARI is driven from Uzbekistan import marine time database, government authorities, and other sources of the Uzbekistan. We update data regularly and provide latest and updated Import Data.
We provide an online customized Uzbekistan Importers Data dashboard where traders can analyse competitors, Uzbekistan importers, overseas suppliers and exporters, top imported products, importing partners etc. DIRE?TSIYA ?APITAL NOGO STROITEL STVA AO O ZBEKISTON TEMIR YO LLARI can analyse trade relations and sourcing for buyers by time like monthly, yearly.
DIRE?TSIYA ?APITAL NOGO STROITEL STVA AO O ZBEKISTON TEMIR YO LLARI has customized dashboard for Uzbekistan importers. Also they provide demo data search and you can search and analyse all available data records in this. You can download Import data set by selecting them.
Import Shipments48
Buyers48
Export Shipments0
Suppliers0
DIRE?TSIYA ?APITAL NOGO STROITEL STVA AO O ZBEKISTON TEMIR YO LLARI automation import markets
Based on Uzbekistan Countries shipment data.
Top import Competitors
By Shipments
Top import Supplier
By Shipments
Top import HsCode
By Shipments
Top import Country
By Shipments
48
If you are looking to establish relationship with DIRE?TSIYA ?APITAL NOGO STROITEL STVA AO O ZBEKISTON TEMIR YO LLARI Automation you can save time by getting access to the key decision makers and get a detailed report.
48 Import Shipments found from 48 importing countries.
HSN Code | Product Description | Imports | Exporter | Origin | Destination | Qty. | More Columns Click to View |
---|---|---|---|---|---|---|---|
8530100000 | ELECTRICAL DEVICES FOR TRAIN TRAFFIC CONTROL: MPC-EL SYSTEM FOR ELECTRIC DEPOTS WITH SINGLE-THREAD RAIL CHAINS, INCLUDING ZIP - 1 SET, DISASSEMBLED SET. MANUFACTURER LLC 1520 SIGNAL RUSSIA. THE PRODUCT IS NEW IN 2022. IT IS A FUNCTIONALLY COMPLETE ELECTRICAL CENTRALIZATION SYSTEM DESIGNED TO CONTROL ARROWS, SIGNALS, ROUTE SIGNS, SOUND DETECTORS, AS WELL AS TO CONTROL AND ENCODE RAIL CIRCUITS WITH APC SIGNALS FOR | RUSSIAN FEDERATION | Uzbekistan | 0 | 60 More Columns Available | ||
8530100000 | ELECTRICAL DEVICES FOR RAILWAY TRAFFIC CONTROL: EQUIPMENT FOR DETECTING OVERHEATED AXLE BOXES, INCLUDING ZIP - 2 SET, DISASSEMBLED SETS. MANUFACTURER LLC INFOTEX AT RUSSIA. THE PRODUCT IS NEW IN 2022. IT IS INTENDED FOR DIAGNOSTICS OF RUNNING PARTS OF RAILWAY ROLLING STOCK ON THE COURSE OF THE TRAIN. TO IMPLEMENT THE PROJECT, THE CONSTRUCTION OF AN ELECTRIFIED HIGH-SPEED DOUBLE-TRACK RING RAILWAY IN THE CITY OF TASHKENT - WEIGHT: 1225 KG, 2 PCS., ; 2)39 SEATS | RUSSIAN FEDERATION | Uzbekistan | 0 | |||
8530100000 | 1)MPC-EL SYSTEM FOR ELECTRODEPO WITH SINGLE-THREAD RAIL CHAINS, INCLUDING ZIP - 0.3 KIT, PART OF THE KIT IN DISASSEMBLED FORM, MANUFACTURER LLC 1520 SIGNAL RUSSIA. TO IMPLEMENT THE PROJECT, THE CONSTRUCTION OF AN ELECTRIFIED HIGH-SPEED DOUBLE-TRACK RING RAILWAY IN THE CITY OF TASHKENT - WEIGHT: 2579 KG, 1 PIECE, ; 2)41 DER.BOX /CRATE / CART.BOX/PALLET | NULL | Uzbekistan | 0 | |||
8530100000 | 1)EQUIPMENT FOR DETECTING OVERHEATED BOXES, INCLUDING ZIP - 0.8 KIT, PART OF THE KIT IN DISASSEMBLED FORM, MANUFACTURER OF INFOTEX AT LLC RUSSIA. TO IMPLEMENT THE PROJECT, THE CONSTRUCTION OF AN ELECTRIFIED HIGH-SPEED DOUBLE-TRACK RING RAILWAY IN THE CITY OF TASHKENT - WEIGHT: 512 KG, 2 PCS., ; 2)3 CARDBOARD BOX | NULL | Uzbekistan | 0 | |||
7308100000 | 1)THE BASE OF THE METAL STRUCTURE OF SPANS WITH A LENGTH OF 6X66M (INCLUDED) - 7.7212 TONS, ACCORDING TO THE PROJECT CONSTRUCTION OF A NEW RAILWAY LINE SHAVKAT - KARAUZYAK AND A COMBINED RAILWAY AND A/ M BRIDGE OVER THE AMU DARYA RIVER - WEIGHT: 7721.2 KG, ; 2)1 ATTACHMENT; 1)THE BASE OF THE METAL STRUCTURE OF SPANS WITH A LENGTH OF 6X66M (INCLUDED) - 5.3960 TONS, ACCORDING TO THE PROJECT CONSTRUCTION OF A NEW RAILWAY LINE SHAVKAT - KARAUZYAK AND A COMBINED RAILWAY AND A/ M BRIDGE OVER THE AMU D | RUSSIAN FEDERATION | Uzbekistan | 0 | |||
See all that you can accomplish with Eximpedia